电力论文参考文献格式

论文价格:0元/篇 论文用途:仅供参考 编辑:论文网 点击次数:0
论文字数:**** 论文编号:lw20237660 日期:2023-07-16 来源:论文网

电力论文参考文献格式一


[1] 王革华,田雅林,袁婧婷.能源与可持续发展[M].化学工业出版社,北京,2005.
[2] 朱祚云,孙健刚,毕毓良等.风力发电对上海电网的影响[J].供用电,2007,24(4):5-8.
[3] Ronan D,Eleanor D,Mark O'.System operation with a significant wind powerpenetration[C].IEEE Power Engineering Society General Meeting,Denver,2004.
[4] Holttinen H . The impact of large scale wind farm integration in Nordiccountries[D].Espoo,Finland:Helsinki University,2004.
[5] Holttinen H.Hourly wind power variations in the Nordic countries[J].Wind Energy,2005,8(2):173-195.
[6] Ronan D,Mark O.A new approach to quantify reserve demand in systems withsignificant installed wind capacity[J].IEEE Trans on Power Systems,2005,20(2):587-595.
[7] 孙元章,吴俊,李国杰,等.基于风速预测和随机规划的含风电场电力系统动态经济调度[J].中国电机工程学报,2009,29(4):41-47.
[8] 李强,袁越,李振杰,等.考虑峰谷电价的风电–抽水蓄能联合系统能量转化效益研究[J].电网技术,2009,33(6):13-18.
[9] 雷亚洲.与风电并网相关的研究课题[J].电力系统自动化,2003,27(8):84-89.
[10] 戴慧珠,王伟胜,迟永宁.风电场接入电力系统研究的新进展[J].电网技术,2007,31(20):16-23.
[11] Holttinen H.Impact of hourly wind power variations on system operation in theNordic countries[J].Wind Energy,2005,8(2):197-218.
[12] Hadi B , Luo Changling , Boon T O . Impacts of wind power minute-to-minutevariations on power system operation[J].IEEE Trans on Power Systems,2008,23(1):150-160.
[13] Freris L,Infield D.Renewable energy in power systems[M].Chester:A John Wiley& Sons,Ltd,Publication,2008:27-33.
[14] 陈树勇,戴慧珠,白晓民,等.风电场的发电可靠性模型及其应用[J].中国电机工程学报,2000,20(3):26-29.
[15] 庞峰.电力电量平衡新方法[J].水力发电学报,2001,20(4):117-123.
[16] 马光文,王黎.水电站群在电力系统中工作位置的确定[J].水力发电学报,1992,11(1):39-46.
[17] 吴东平,万永华.日电力电量平衡的余荷逐次后移法[J].水力发电学报,1994,13(3):31-36.
[18] 蔡建章,蔡华祥,洪贵平.电力电量平衡算法研究与应用[J].云南电力技术,1994,3:8-12.
[19] 衣立东,朱敏奕,魏磊,姜宁,于广亮.风电并网后西北电网调峰能力的计算方法[J].电网技术,2010,34(2):129-132.
[20] 李茜,刘天琪,李兴源.大规模风电接入的电力系统优化调度新方法[J].电网技术,2012,36(0):1-8.
[21] 莫若慧.海南电网水火电联合调峰方法与应用研究[D].华中科技大学,2010.
[22] 李付强,王彬,涂少良,等.京津唐电网风力发电并网调峰特性分析[J].电网技术,2009,33(18):128-132.
[23] 张宏宇,印永华,申洪,等.大规模风电接入后的系统调峰充裕性评估[J].中国电机工程学报,2011,31(22):26-31.
[24] 张宏宇,印永华,申洪,等.基于序贯蒙特卡洛方法的风电并网系统调峰裕度评估[J].电力系统自动化,2012,36(1):32-37.
[25] 吴淳.风电对电力系统调频和备用的影响研究[J].华东电力,2011,39(6):993-996.
[26] 于达仁,郭钰锋.一次调频的随机过程分析[J].中国电机工程学报,2002,22(6):38-41.
[27] 于达仁,郭钰锋.电网一次调频能力的在线估计 [J].中国电机工程学报,2004,24(3):72-76
[28] 熊观佐.互联系统分析与运行[M].北京: 水利电力出版社.1995.
[29] Kothari M L, Nanda J, Koathari D P, et al.Discrete-mode AutomaticGeneration Control of a Two-area Reheat Thermal System with New AreaControl Error [J].IEEE Trans on Power Systems,1989,10(5):730-738.
[30] 孟祥萍,薛昌飞,张化光.多区域互联电力系统的 PI 滑模负荷频率控制[J].中国电机工程学报,2001,21(3):6-11.
[31] Y.L.Abdel-Magid , M.M.Dawoud . Optimal AGC Tuning with GeneticAlgorithms [J].Electric Power System Research,1996,38(3):231-238.
[32] C.S.Chang,Weihui Fu.Area Load Frequency Control using Fuzzy GainScheduling of PI Controllers [J].Electric Power System Research,1997,42:145-152.
[33] H Shayeghi, H.A.Shayanfar. Application of ANN Technique Based onμ-synthesis to Load Frequency Control of Interconnected Power System[J].Electrical Power and Energy Systems 2006,28:503-511.
[34]张步涵,邵剑,吴小珊,王魁.基于场景树和机会约束规划的含风电场电力系统机组组合[J]. 电力系统保护与控制,2013,41(1):127-135.
[35] Shamshad, M. Bawadi, W. W. Hussin, T. Majid, and S. Sanusi.First and second orderMarkov chain models for synthetic generation of wind speed time series[J].Energy,2005,30:693–708.
[36] Kevin Brokish, James Kirtley.Pitfalls of Modeling Wind Power Using MarkovChains[C].Power Systems Conference and Exposition,2009,PSCE '09. IEEE/PES,1-6.
[37] F. O. Hocaoglu, O. N. Gerek and M. Kurban.The Effect of Markov Chain State Sizefor Synthetic Wind Speed Generation[C].Probabilistic Methods Applied to PowerSystems,2008,PMAPS '08. Proceedings of the 10th International Conference,1-4.
[38] Dupacova, Growe-Kuska J, Romisch N W . Scenario reduction in stochasticprogramming: an approach using probability metrics[J].Mathematical Programming,2003,95:493-511.
[39] Holger Heitsch, Werner Romisch . Scenario reduction algorithms in stochasticprogramming[J].Computational Optimization and Applications,2003,24:187-206.
[40] 刘宝碇,赵瑞清.不确定性规划及应用.北京:清华大学出版社,2003.


电力论文参考文献格式二


[1] 杨莳百, 戴景宸, 孙启宏. 电力系统可靠性分析基础及应用. 北京: 水利电力出版社, 1986
[2] 宁辽逸, 吴文传, 张伯明. 电力系统运行风险评估中元件时变停运模型分析. 电力系统自动化, 2009, 33(16): 7-12
[3] BILLITON R, ALLAN R N. Reliability evaluation of engineering systems: conceptsand techniques. New York, NY, USA: Plenum Press, 1983
[4] Li W. Risk assessment of power system: models, methods, and applications. USA andCanada: IEEE Press and John Wiley & Sons, Inc. , 2005
[5] 郭永基. 可靠性工程基础. 北京: 清华大学出版社, 2002
[6] IEEE Std C57.91-1995 IEEE guide for loading mineral-oil-immersed transformers,1995
[7] GB/T 15164-94 油浸式电力变压器负载导则, 1994
[8] 国家电网公司. 油浸式变压器(电抗器)状态评价导则. 北京: 国家电网公司, 2008
[9] PATHAKJ, JIANGY, HONAVARV, et al﹒Condition data aggregation with applicationto failure rate calculation of power transformers// Proceedings of the9thInternationalConference on Probabilistic Methods Applied to Power Systems, June 11-15, 2006,Stockholm, Sweden: 1-7
[10] 宁辽逸, 吴文传, 张伯明. 运行风险评估中的变压器时变停运模型(一)基于运行工况的变压器内部潜伏性故障的故障率估计方法. 电力系统自动化, 2010,34(15):9-13, 95
[11] Li W. Incorporating aging failure in power system reliability evaluation. IEEETransactions on Power Systems, 2002, 17(3): 918-923
[12] Jong-Fil Moon, Jea-Chul Kim, Hee-Tae Lee, et al. Time-varying failure rate extractionin electric Power distribution equipment. 9thInternational Conference on ProbabilisticMethodsApplied to Power Systems KTH, Stockholm, Sweden. June11-15, 2006.5.20
[13] M. Mirzaie, A. Gholami, F. Aminifar, R. Saeedfar. Failure analysis and reliabilityevaluation of Power transformers. Journal of Electrical systems, 2006, 2(l): l-2
[14] William H.BartleyP.E. Analysis of transformer failures. International Association ofEngineering Insures 36thAnnual Conference, Stockholm, Sweden, 2003
[15] W. H. Tang, Q. H. Wu, Z. J. Richardson. Equivalent heat circuit based powertransformer thermal model. IEE Proceedings Electric power Applications. 2002,149(2):87-92
[16] W. H. Tang, Q. H. Wu, Z. J. A Simplified Transformer Thermal Model Based onThermal-Electric Analogy. IEEE Transactions on Power Delivery, 2004, 19(3):1112-1118
[17] 郭永基. 中小容量电力变压器寿命评估的新方法. 电力系统自动化, 2001, 25(21):38-41
[18] 王昌长, 李福祺, 高胜友. 电力设备的在线监测与故障诊断. 北京: 清华大学出版社, 2006
[19] IEEE Standard 346: Terms for reporting and analyzing outage of electrical transmissionand distribution facilities and interruptions to customer service. IEEE, Piscataway, NJ,1973
[20] Li WY, Zhou JQ, Xiong XF. Fuzzy models of overhead power line weather-relatedoutages. IEEE Transactions on Power Systems, 2008, 23(3): 1529-1531
[21] Gupta S, Pahwa A, Zhou YJ, et al. An adaptive fuzzy model for failure rates ofoverhead distribution feeders. Electric Power Components and Systems, 2005, 33:1175-1190
[22] 孙荣富, 程林, 孙元章. 基于恶劣气候条件的停运率建模及电网充裕度评估. 电力系统自动化, 2009, 33(13): 7-12
[23] Billinton R, Allan R N. Reliability evaluation of power systems. 2nded. , New York andLondon: Plenum Press, 1996
[24] Billinton R, Jain A V. Unit derating levels in spinning reserve studies. IEEETransactions on Power Apparatus and Systems, 1971, 90(4): 1677-1687
[25] Allan R N, Billinton R, Abdel-Gawad N M K. The IEEE reliability testsystem-extensions to and evaluation of the generating system. IEEE Transactions onPower Systems, 1986, 1(4): 1-7
[26] Samaan N, Singh C. Genetic algorithms approach for the assessment of compositepower system reliability considering multi-state components. 8thInternationalConference on Probabilistic Methods Applied to Power Systems, Iowa State University, Ames, Iowa, Sep. 12-16, 2004
[27] Bhuiyan M R, Allan R N. Modeling multi-state problems in sequential simulation ofpower system reliability studies. IEE Proceeding: Generation, Transmission andDistribution, 1995, 142(4): 343-349
[28] Billinton R, Lian G. Consideration of dependent outage in security-constrainedadequacy evaluation of composite systems. IEE Proceedings: Generation, Transmissionand Distribution, 1994, 141(1): 47-52
[29] Billinton R, Medicherla T K P, Sachdev M S. Application of common-cause outagemodels in composite system reliability evaluation. IEEE Transaction on PowerApparatus and Systems, 1981, 100(7): 3648-3657
[30] 孙元章, 程林, 何剑. 电力系统运行可靠性理论. 北京: 清华大学出版社, 2012
[31] 孙元章, 程林, 刘海涛. 基于实时运行状态的电力系统运行可靠性评估. 电网技术,2005, 29(15): 6-12
[32] Sun Y, Cheng L, Liu H, et al. Power system operational reliability evaluation based onreal-time operating state. The 7thInternational Power Engineering Conference,Singapore, Nov, 29-Dec. 2, 2005
[33] 程林, 何剑, 孙元章. 线路实时可靠性模型参数对电网运行可靠性评估的影响. 电网技术, 2006, 30(13): 8-13
[34] He J, Cheng L, Sun Y. Analysis of components’ reliability modeling based onreal-time operating conditions. International Conference on Power System Technology,Chongqing, China, Oct. 2006
[35] 刘海涛, 程林, 孙元章, 等. 基于实时运行条件的元件停运因素分析与停运率建模.电力系统自动化, 2007, 31(7): 6-11
[36] He J, Cheng L, Sun Y. Transformer real-time reliability model based on operatingconditions. Journal of Zhejiang University: SCIENCE A, 2007, 8(3): 378-383
[37] 何剑, 程林, 孙元章, 等. 条件相依的输变电设备短期可靠性模型. 中国电机工程学报, 2009, 29(7): 39-46
[38] He J, Sun Y, Wang P, et al. A hybrid conditions-dependent outage model of atransformer in reliability evaluation. IEEE Transactions on Power Delivery, 2009, 24(4):2025-2033
[39] 何剑, 程林, 孙元章, 等. 计及天气预测的电力系统运行可靠性短期评估. 电力系统保护与控制, 2010, 38(10): 31-38, 51
[40] Sun Y, Wang P, Cheng L, et al. Operational reliability assessment of power systemsconsidering condition-dependent failure rate. IET Generation, Transmission &Distribution, 2010, 4(1): 60-72


电力论文参考文献格式三


[1] 周玮等, 含风电场的电力系统动态经济调度. 中国电机工程学报, 2009,29(25):13-18.
[2] 陈海焱, 陈金富与段献忠, 含风电场电力系统经济调度的模糊建模及优化算法.电力系统自动化, 2006,30(2): 22-26.
[3] Pathom Attaviriyanupap , Hiroyuki Kita , Eiichi Tanaka , et al . AFuzzy-Optimization Approach to Dynamic Economic Dispatch ConsideringUncertainties.IEEE Transactions on Power Systems, 2004, 12(3):1299-1307.
[4] Pathom Attaviriyanupap,Hiroyuki Kita, Eiichi Tanaka,et al.A Hybrid EP and SQPfor Dynamic Economic Dispatch With Nonsmooth Fuel Cost Function.IEEETransactions on Power Systems, 2002, 17(2):411-416.
[5] WU Ya-li,XU Li-qing.An Improved cultural particle swarm optimizationalgorithm based on feedback mechanism for economic load dispatchproblems.International Conference on Computational Aspects of Social Networks,2010.
[6] Xin MA,Yong LIU.Dynamic Load Economic Dispatch in Electricity MarketUsing Improved Particle Swarm Optimization Algorithm.International Conferenceon Intelligent Computation Technology and Automation,2010.
[7] Yongqiang Wang,Jianzhong Zhoua,Wen Xiao,et al.Economic load dispatch ofhydroelectric plant using a hybrid particle swarm optimization combinedsimulation annealing algorithm.Second WRI Global Congress on IntelligentSystems,2010.
[8] Shi Lianjun, Zeng Ming,Yan Fan, et al. Economic Dispatch Model ConsideringRandomness and Environmental Benefits of Wind Power. 10 Proceedings of the2010 International Conference on Electrical and Control Engineering,Washington, DC,2010.
[9] Cheng Yunzhi. A new approach for emissions and security constrained economicdispatch. Starkville, MS, USA,2010.
[10] 袁铁江等, 大规模风电并网电力系统动态清洁经济优化调度的建模. 中国电机工程学报, 2010(31): 7-13.
[11] 彭春华与孙惠娟, 基于非劣排序微分进化的多目标优化发电调度. 中国电机工程学报, 2009(34): 71-76.
[12] 谢国辉.绿色发电调度模式和模型研究.华北电力大学(北京),2010.
[13] 袁铁江等, 电力市场环境下含风电机组的环境经济调度模型及其仿真. 电网技术, 2009(6): 67-71.
[14] 吴栋梁等, 电力市场环境下考虑风电预测误差的经济调度模型. 电力系统自动化, 2012(6): 23-28.
[15] 谭伦农,张保会. 市场环境下的事故备用容量[J]. 中国电机工程学报,2002,22(11),54-58
[16] 戴俊良. 基于 CR 的电力市场应用研究. 华北电力大学(北京),2008.
[17] 李利利等, 月度安全约束机组组合建模及求解. 电力系统自动化, 2011(12):27-31.
[18] 杨争林与唐国庆, 全周期变时段“三公”调度发电计划优化模型. 电网技术,2011(2): 132-136.
[19] 李利利等,均衡发电量调度模式下的 SCED 模型和算法. 电力系统自动化,2010(15): 23-27.
[20] Guodong Liu,Kevin Tomsovic. Quantifying spinning reserve in systems withsignificant wind power penetration[J]. IEEE Transactions on Power Systems, 2012,27(4):2385-2393.
[21] 葛炬, 王飞,张粒子.含风电场电力系统旋转备用获取模型. 电力系统自动化,2010(6): 32-36.
[22] 李霞,刘俊勇,刘友波,等.计及调度一致性的含风电系统备用优化分配. 电力系统自动化, 2013.
[23] 王丹平,陈之栩,涂孟夫,等.考虑大规模风电接入的备用容量计算. 电力系统自动化, 2012(21): 24-28.
[24] 夏澍, 周明,李庚银.考虑线路安全校核的含风电电力系统有功和备用协调调度. 中国电机工程学报, 2013(13): 18-26.
[25] Senjyu T, Shimabukuro K , Uezato K , Funabshi T. A fast technique for unitcommitment problem by extended priority list[J]. IEEE Transactions on PowerSystems, 2003, 12:882-888.
[26] Snyder W L, Dpowell H, Rayburn C. Dynamic programming approach to unitcommitment[J]. IEEE Transactions on Power Systems, 1987,2(2): 339-350.
[27] Weerakorn, Ongsakul , Nit P. Unit commitment by enhanced adaptive lagrangianrelaxation[J].IEEE Transactions on Power Systems, 2004 , 19(2):620-628.
[28] Juste K A ,Ktta H , Tanaka E, et al.An evolutionary programming solution to theunit commitment problem[J]. IEEE Transactions on Power Systems, 1999,14(23):1452-1459.
[29] 张小平,陈朝晖. 基于内点法的安全约束经济调度[J]. 电力系统自动化,1997,21(6): 27-54.
[30] 郭志东,徐国禹. 用二次规划法解算互联系统经济调度[J]. 电力系统自动化,1998,22(1):40-44.
[31] Mota P P,Quintana V H. A Penalty function linear programming method for solvingpower system constrainted economic operation problems[J]. IEEE Transactions onPower Appatatus and Systems, 1984, 103(6): 1414-1442.
[32] Han X S, Gooi H B, Kirschen D S.Dynamic economic dispatch : feasible andoptimal solutions[J].IEEE Trans on Power Systems, 2001, 16(1): 22-28.
[33] 石立宝,徐国禹. 遗传算法在有功安全经济调度中的应用[J]. 电力系统自动化,1997,21(6):42-44.
[34] 侯云鹤等, 改进粒子群算法及其在电力系统经济负荷分配中的应用. 中国电机工程学报, 2004(7): 99-104.
[35] 侯云鹤等, 基于广义蚁群算法的电力系统经济负荷分配. 中国电机工程学报,2003(3): 59-64.
[36] 多目标混合进化算法及其在经济调度中的应用[J]. 电力系统自动化,2007,19(2):66-72.
[37] Wang S,Baran M E.Reliability assessment of power systems with wind powergeneration[C].Power and Energy Society General Meeting,Minneapolis,MN,2010.
[38] 张宏宇等, 大规模风电接入后的系统调峰充裕性评估. 中国电机工程学报,2011(22): 26-31.
[39] 戴俊良等, 基于基尼系数的电力调度公平性指标探讨 . 电力系统自动化,2008(2): 26-29.
[40] 魏学好, 胡朝阳与杨莉, 对“三公”调度现有评价指标的思考和建议. 电力系统自动化, 2012(20): 109-112.

如果您有论文相关需求,可以通过下面的方式联系我们
客服微信:371975100
QQ 909091757 微信 371975100